Active construction

Flooring Installation During Active Construction

We installed a floating floor through multiple areas while construction continued around the project.

Light floating floor continuing through a hallway during active construction.

Project Overview

About This Installation

The floor runs through several connected spaces and was fitted around existing tree features within the home.

Planning focus
Coordinating the flooring installation with an active construction schedule while keeping the flooring work clearly separated from the finish work that continued afterward.
What the gallery shows
The active-construction conditions, installation progress, completed flooring, and the surrounding work that continued after the flooring was finished.

WHAT THIS PROJECT DEMONSTRATES

YOUR PROJECT

Need flooring installed while other construction work is underway?

Request an Estimate